Why these dates slip
Warranty periods start when the work is finished, which is exactly when the project team moves on. The usual causes:
- The project team has moved on. The people who know the hand-over date are already working on the next project.
- The date is unclear. Practical completion, formal acceptance and first use are different moments, and the contract may count from any of them.
- Several periods run side by side. A building, its installations and a supplied component can each have their own period and end date.
- Defects are noted but not logged. Issues are reported by phone or email, and nobody records when they were reported or whether they were resolved.
- Retained amounts are forgotten. Money held back until the end of the period is not released because nobody was watching the date.
- Documents are scattered. The acceptance report, the warranty terms and the contact at the supplier sit in different places.
Points to confirm with your contract or a legal adviser
Terms differ by contract, sector and country. This article states no specific periods. Check in your own contract or with a legal adviser:
- What starts the period. Hand-over, acceptance, first use or delivery. Use the date the contract names.
- How long each period runs. Different parts of the work may have different lengths.
- How defects must be reported. Some contracts require written notice, by a set date, to a named contact.
- What happens to retained amounts or guarantees. Release may depend on a final inspection or a written confirmation.
- Who is responsible during the period. The contractor, a subcontractor or a manufacturer may each carry part of it.
This article is practical guidance, not legal advice. Whatever the contract says, the practical problem is the same: the right person has to know the right date early enough.
What to record for each delivered project
- Project, client and responsible manager — what was delivered and who answers for it.
- Hand-over or acceptance date — the date the contract counts from, and where the signed report is stored.
- Each warranty or defects period — scope, start date and end date per part of the work.
- Final inspection date — if one is planned before the period ends.
- Claim and notice steps — what must be reported, to whom, in what form and by when.
- Retained amount or guarantee — what is held back and the conditions for release.
- Open defects — reported date, status and who is resolving each one.
- Owner and deputy — one person who follows up, and someone who covers.
A practical rhythm
- Enter the dates at hand-over. Record the periods while the project team still has the documents in front of them.
- Plan a check before the end. Schedule a walk-through or review well before the end date so defects can still be reported.
- Log every defect. Write down when it was reported, to whom and how it was resolved.
- Chase release. When the period ends without open issues, ask for the retained amount or guarantee to be released.
- Pass on knowledge. If the owner changes, hand over the entry together with the documents.
- Close each entry. Record the outcome and archive the documents with the project file.
Frequently asked questions
Is the end date the only date that matters?
No. The last moment to report a defect, a planned final inspection and the release of retained amounts can all come before or after it. Put each in the calendar.
What if a defect is reported after the period ends?
That depends on the contract and the rules that apply. Ask a legal adviser, and avoid the situation by checking before the end date.
Who should own this?
One named person per project, often in operations or project control, with a deputy. The project manager supplies the facts and the owner makes sure the dates are followed.
Does this apply to small jobs too?
Yes. Any delivered work with a period attached has a date that someone has to watch.
Practical checklist
- List all delivered projects that still have a running warranty or defects period.
- Record the hand-over date and where the signed acceptance is stored.
- Add the end date for each part of the work.
- Plan a pre-end review and note the claim steps that apply.
- Note any retained amount or guarantee and its release condition.
- Give each project an owner and a deputy.
- Set reminders ahead of the review and the end date.
- Log defects and outcomes in one place.
How ExpiryKit helps
ExpiryKit keeps warranty and defects-liability dates in the same register as your certifications, permits, contracts and other renewals. Record each delivered project with its hand-over date, end date and review date, so reminders at 60, 30, 14 and 7 days give the owner time to check for defects, report them and ask for the release of retained amounts. Each entry gets a named owner, and reminders go to that person, not to a shared inbox.